|
It took working in the dark with a construction lamp to get the third (top) stripe added in time before I had to leave, but the end result sure was worth it. I used Rustoleum applied with a roller. This paint needs to cure fully before adding a second layer making it necessary to add the first layer at night and the second on the morning of my departure.
|